difference between specification and method of statement

Answer Posted / john

Hello my name in John I'm an architectural engineer with more than 3 years of experience in engineering field.. I hope this will help.

specification making depends on what specifications your going to specify.

like for example ill make specifications regarding architectural work, you will just usually specify your materials and scope of work.. see sample below.

1. Doors - should be painted green and have a dimension of 2100mm x 900mm they should be 50mm THK. and have stainless steel handles. Door frames should be painted green to match with the door leaf.

2. Windows - should be 900x1200mm wide, the window frames should be tubular and powder coated and to be painted green to match with the doors.

3. Ceiling - height should be 2400mm from the floor finish, the ceiling should be 6mm thk. fiber cement board. to be painted green to match with the doors.

4. floor – will be covered with 600x600x6mm thk. Floor tiles, color to match with door.

etc....

While in method statement you should specify the instruction or the step by step procedure in construction..

e.g. Lets say you'll make an architectural method statement.. see sample below..

step 1. Before any architectural works can begin the site engineer will make sure all structural works should be completed first..
step 2. after the structural is finished install all supporting systems required by MEP. Structural engineer to supervise site installation..
step 3. Create all necessary wall opening and clean them with (whatever the subcontractors proposal) so that dust other vermin cant compromise the integrity of the openings.
step 4. Install all doors and windows as per the suppliers specifications. (usually attachment of catalogue is inserted).
Step 5. Install all ceiling and necessary supports required make sure that the connections are complying with building codes etc…
Step6. Before installing floors make sure that the floor have the minimum amount of dust/vermin then apply a water proofing paint all over the wet area after provide a 20mm thk. Setting concrete, and layout the tiles accordingly.
Step 7. Install blah blah blah blahh......... with supervision of site engineer blah blah blah…

I hope this samples will help you understand better..

Please note that these are just samples. Writing specifications and method statements are much more complicated than what I have shown above, these are just simplified versions, to be able to write them properly you need to have a lot of site (construction) experiences + knowledge in handling and installation of materials..

Is This Answer Correct ?    12 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define What materials were used to build the Golden Gate Bridge?

649


What year was the keystone power plant in Indiana County constructed?

735


column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial

3496


How much cement is require in one sqft area in a G+3 residential construction.

1609


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2127






What is the difference between EPC,DBOOT and BOOT.

23392


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

1672


indian standard split spoon sampler

1560


HOw much % of premium on DSR-2013 currently

1546


Technical Question of Civil Engineering

1898


What is Base Shear ?

677


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2043


Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

1796


What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

1919


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1408