Hello my name in John I'm an architectural engineer with more than 3 years of experience in engineering field.. I hope this will help.
specification making depends on what specifications your going to specify.
like for example ill make specifications regarding architectural work, you will just usually specify your materials and scope of work.. see sample below.
1. Doors - should be painted green and have a dimension of 2100mm x 900mm they should be 50mm THK. and have stainless steel handles. Door frames should be painted green to match with the door leaf.
2. Windows - should be 900x1200mm wide, the window frames should be tubular and powder coated and to be painted green to match with the doors.
3. Ceiling - height should be 2400mm from the floor finish, the ceiling should be 6mm thk. fiber cement board. to be painted green to match with the doors.
4. floor – will be covered with 600x600x6mm thk. Floor tiles, color to match with door.
etc....
While in method statement you should specify the instruction or the step by step procedure in construction..
e.g. Lets say you'll make an architectural method statement.. see sample below..
step 1. Before any architectural works can begin the site engineer will make sure all structural works should be completed first..
step 2. after the structural is finished install all supporting systems required by MEP. Structural engineer to supervise site installation..
step 3. Create all necessary wall opening and clean them with (whatever the subcontractors proposal) so that dust other vermin cant compromise the integrity of the openings.
step 4. Install all doors and windows as per the suppliers specifications. (usually attachment of catalogue is inserted).
Step 5. Install all ceiling and necessary supports required make sure that the connections are complying with building codes etc…
Step6. Before installing floors make sure that the floor have the minimum amount of dust/vermin then apply a water proofing paint all over the wet area after provide a 20mm thk. Setting concrete, and layout the tiles accordingly.
Step 7. Install blah blah blah blahh......... with supervision of site engineer blah blah blah…
I hope this samples will help you understand better..
Please note that these are just samples. Writing specifications and method statements are much more complicated than what I have shown above, these are just simplified versions, to be able to write them properly you need to have a lot of site (construction) experiences + knowledge in handling and installation of materials..
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
what is Brick crushing strength(PSI)?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
How is make concrete cube?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
What tor stands for in tor steel?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
in design case of structural member best suitrable percentage of steel limit is what
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
what are the layers of the national and heir aprox thickness??
what is E
How is improve my knowledge in construction industries....
How can we convert weight batch to volume batch for m30 mix
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??