For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the
weight of sand and aggregate
Answer Posted / parvesh saini
Cement - 50kg
Sand -100kg
Agg. -200kg
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
cement and sand required for one block of size 0.23*0.15*0.46
all technical question
Explain moment of inertia?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
what is w/c ratio in dry lean concrete for m10 mix design
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Why should appointment store person for project ? what is the benefits for company ?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is construction mitigation management?