What is the role and reponsibilities of Electrical
Engineers in construction field?
Answer Posted / mariappan
• Study of drawing and execute the work
• To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
• To provide the entire electrical solutions as per requirement.
• Design for illumination of different area and lux calculation.
• To check the entire work as according to approved drawings.
• Handling of electrical load as per requirement.
• Cable size calculation cable scheduling &its route selection ,over head or under ground.
• Review Inspection and Test Plans in order to perform all required inspections and witnessing all required tests and add witness and hold points for the Client’s Inspection.
• Review inspection reports and records of Quality Control carried out on completed and running Project activities.
• Review Client’s Inspectors deliverables, analyse and resolve issues and problems emerging during the Quality Control activities. Ensure that all inspection and tests witnessed by clients
• Drawing submission and get Approval from consultants
• Site issues highlighting and send to consultant
• Site Additional work Prepairation and send the Quotation
• Check and Plan the EOT Date & schedule of the Project
• Every two week once attend the site technical coordination meeting
• Monthly once attend the site safety coordination meeting
• Detail engineering with safety factor in the design.
• Updating the Drawing depends on site condition
• Mock up unit Prepairation and execution
• Checking the Workmanship and material Quality as per approved make and standard work for the Right quality and standard work
• Daily & Weekly work Progress Report Prepairation and Keep the Record
• Preparing the Monthly work Progress Report for Claim with Measurements
• Monthly LEW Tools inspection check list Prepairation and checking
• Daily I conduct and maintain the tools box meeting and checking the Height work Permit (above 2m)
• Preparation of Project Report for correct and Timely information for the Progress of work
• Responsible to do surveys including site measurements
• Responsible for Highlighting foreseen Problem & Delays in advance Escalating to the PM
• Client communication and correspondence
• Quality Assurance
• Coordination with workers
• Manpower Controlling and solve the Problem
• Updating of material stock
• Weekly Material Requirement to be send by email to office
• Final Documentation & Billing Works
| Is This Answer Correct ? | 58 Yes | 6 No |
Post New Answer View All Answers
what is meant by 2 within a star in a voltmeter dial?
how does WTI work ?
what is the meaning of neutral displacement ???
how to select proper cable for ct wiring so that drop within the limit.
please send me previous year questions of jspl through which i could prepare myself for the test.
why we r not earthed Control cable of C.T. terminals
What will be the current drawn by HT motor, if low voltage is applied.. any formula to calculate the LT amps of HT motor.?
why we take movement of rotor always in counter-clockwise direction in 3-phase induction motors?
What is the meaning of floating point earthing in battery backed systems ?
what are the major & minor faults that occur in an inverter and in UPS ? And how to repair and resolve them ?
PLEASE ANYBODY HAVE ELECTRICAL CIRCUIT DIAGRAM FOR CHMER PULSE CD 60M SPARKING MACHINE.PLEASE MAIL ME SUPRIYAAYYAPPAN@YAHOO.CO.IN.
When the relative speed between the magnetic fields of stator and rotor does is zero under steady state operation?
What are operating procudures & Safety precautions to be observed while operating OLTC in manual mode ?
how to calculate units consumption for a 12 hp motor /hr.
advantages & disadvantages of Lagging and leading power factor .