How does a 3 phase induction motor is started?
Answer Posted / rsr
3 phase supply fed to 3 phase stator winding produces rotating magnetic field rotating at synchronous speed. This field cuts the rotor conductors(bars) and according to faraday's law of electromagnetic induction, an emf is induced in the conductors. since the conductors are short circuited by end rings(squirrel cage), thus current stsrts flowing & it produces its own field. now, we have two fields - one produced by stator and other by rotor , the interaction of these two field led to the development of torque in the direction of rotating magnetic field as per the lenz law
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
why we use two slope(differential & restraining) in differential relay.but in busbar protection differential we are using only one slope?please explain
what is a vector protection in transformer
How to determine alternating current frequency?
what is inverter and converter
what is the difference between electrical choke and electronic choke?
Explain what is rated speed?
what do you mean by type zero control sytem ?Give an practical example of type zero contol sytem?
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???
What is effect of over voltage and under voltage on ACB
Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.
What is the suitable transmission voltage?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?
is all the servo motors having brake?please specify which servo motors having brake for stop on position and which are not.
what will be d.g. capacity to cater together for 14hp A.C. load & 3kw lighting load