Dear Friends,
Need your help for connecting APFC panel,
Quotation : I have 2 No’s 1000 KVA Transformers, both transformers are having separate APFC panels, ( Tr-1,400KVAR, TR-2,450 KVAR)
Now I want to stop One transformer, present load is 650Amps, Max, So One transformer is enough, I have switched OFF TR-1, but PF is not maintaining properly, its 0.5, So now I want to connect TR-2 APFC also in TR-1 Loads, Can any one answer for my Quotation with drawing, how to connect TR-2 APFC panel in TR-1 Loads,
Answer Posted / srinivasvemana
Dearsir
you placed one ct tr -1 incoming ct connection given in Apfc-2 and apfc-2 power also take from tr-1.after you have 2 apfc panels working on one transformer.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
how many types are their in switchyard or substation(like D,I TYPE), what is differant between them
What are n circles?
What is the unit audit? if our Max demand is something and we found much more unit then how to improve our max demand?
What happens if the series current double?
Dyn1 transformer vector group testing how to do
What are the types of transformers according to the arrangement of iron cores?
What are locations arc protection relay is fixed.
why three phase capacitor takes unbalanced current in capacitor bank?
what is the synchronous timer ? and it applications.
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
why only exciting current is shown not primary current in transformer???
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
full form of electrical?
how we can calculate power factor in single phase & three phase ?thank u
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?