Answer Posted / rajesh d karde
vertical member supporting is call shuttering and horizontal
member supporting call centering
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What Are The Steps Involved In The Concreting Process, Explain?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
what is tension & compression of steel bending.
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
Scaffolding IS code NO.
How to come 1.54 from dry to wet concrete?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
Which is the best book for building construction?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
explain five benefits of using standard terminology in the measurement process?
What is meant by engineering drawing?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column