what we execute firstly wall tile or floor tile?
Answer Posted / sagar bothare
First tiles was immerse in to water till 1 hour
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
how to calculate the steel in 500yard
Why do you want to work here
Define What are the materials used in building a gravity dam?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
what is the relation between pitch of steel and depth of slab?
What are the reasons for geotechnical site investigations in uganda?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
Define relative co-ordinates?
What is gravity flow?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is the diff between cad & cadd?
What is meant by a context menu in a cad software?
How to calculate Volume of Wet cement concrete for a specific grade?
What is oneside mat. And explain