Answer Posted / nagarajan
Actually we are following British standard
Main reason
1.Atmospheric condition because USA people's using 110v,60Hz so size of the conductor is big one instead of we are using 220v 50hz s0 size of conductor is less and investment also less.
2.Size of conductor increases amount of heat increases.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
Why efficiency of generator is higher than motor at a particular load?
What is the height of DA, DAL, DB, DC & DDE tower?
In our plant we have installed new MCC with ELR and CBCT which is detecting some leakage current in the system but it leading to some confusion when to check that in which feeder which is drawing current we put off the whole panel itself but still CBCT detecting some leakage current so can anybody ans me , where i am going wrong or how to detect whether its actual leakage or CBCT malfunctioning.
star delta starter contorl circuit... drawing..
what is the saturation point of crgo lamination.
what the principle of sincroscope?how it works?when it needed?
how to calculte capacitor range for single phase induction motors??pls tel
How to calculate Number of Earthing Pits....???
How to know the following data of synchronous generator 1. D-Axis Unsaturated Reactance 2. D-Axis Unsaturated Transient Reactance 3. D-Axis Unsaturated Sub - Transient Reactance
which cable is used for 15 Hp monoblock pump 3phase and service wire Distance is 210 feet please tell me cable size Armaured
hello if any one have papers vof hpcl or sail, plz send me
WHAT IS MEANT BY INSULATION CLEARANCE IN VACCUM?
what is the difference between transformer,converter and transducer
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch