The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me
Answer Posted / ajay saini
actually this condition is due to failure of planning or due to change in planning.but if you have planning of this type of work you should design the load bearing members according to your building design.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how we can find sieve #4 is 4.75mm?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
why do we provide haunches in rcc box or underpasses?
what are the types of design? which type of method is used at what type of design & why?
door and window wood work calculations and different methods
roll of DLC in road constructions
What in bending moment, if a moment is free end of cantilever beam?
What is a kip?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is a projection line?
What is aggregate?
Define What happens to Load at yielding ?
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
trapozidal
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.