The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me

Answer Posted / ajay saini

actually this condition is due to failure of planning or due to change in planning.but if you have planning of this type of work you should design the load bearing members according to your building design.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much cost of single coat 20mm thick plastering per sqre meter

1176


What is the difference between 53 grade and 43 grade cement

1387


How to check slab shuttering level.? Or check list for slab ?

4175


what is the specific gravity of rubble in plum concert

1055


What are segregation and bleeding?

791






Describe the various methods of concrete curing?

777


How to increase a bearing capacity of soil?

743


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1606


What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.

4309


Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?

1685


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1573


sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you

2105


Define What is the best type of wood glue?

742


Define What glue is least sticky?

721


why top layer of block work shoud be full size if any cut block adjustable than another layer?

1770