The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me
Answer Posted / ajay saini
actually this condition is due to failure of planning or due to change in planning.but if you have planning of this type of work you should design the load bearing members according to your building design.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how much to get of BRC lapping in full yield and half yield ?
how much cement sand n bricks required in im3?and how much in plaster?
In the roof of a pumping station explain briefly the components of a waterproofing system?
Define What is the best type of wood glue?
how to estimate material requirement for an area of house in square feet?
What is thumb rule in quantity and cost estimation of a residential building?
how meny typs of renging rod?
what is the types of surveying?which type of survey carrying for type of work?
why building got air crack? if it get in one particular are what is means?
What is Time period of a building and its relation with frequency ?
What is the difference between Fe 500, Fe 500 D and Fe 515.
What is pre-stressed concrete?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Describe a time when you anticipated potential problems and developed Preventive measures