The ff slab casted its thickness
100mm.2nd floor slab will be casting its
300 mm.how we shall be given suppot to
that 300mm thk slab.ple way me
Answer Posted / unnu
Once the first floor slab is set , you can give support for the 2nd floor slab. Nothing is going to give away.FF slab will be already supported by columns
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
what is the painting co efficient of slope roof tiles?
How much cement and water required for cement selery????
Will going from a 3-tap to 6-tap increase water pressure?
List out some of the software program that can be useful for architect?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
what is pouring and explain
what is the calculation of raw material for 0.35cum of m-15
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
What is the use of extend command?
i want texture painting pwd data
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
which method is used in semi-rigid connection design??
What is a projection line?
What is meant by Crystal Concrete?