how did find the quantity of cement ,sand , and aggregate
in concreat which is givan by volume
Answer Posted / selvaraj
I can find this qty by two methods volume basis and weight basis.
Volume basis-ex m15 is 1:2:4 .sum all and kept on detominator and the what mat will be req us ,put on value top.for cement (1/7)x1440.its give kg/m3.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How much for the BRC lapping in full yield and half yield < and which table to get it ?
What is specific gravity???
Why should you consider yourself fit to be hired by jindal steel.
from where ican get sample papers for CET-delhi 2012
Define What is passive earth pressure ?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
which type of instrument included in plumbing work?name of instrument?
In jack arch floor, the rise is kept?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.