we hav job which is running as batch. it takes atleast
06hours to complete tht job. bu i wana do tht job with in
3hours.........?
so plz post ur answers

Answer Posted / nagaraju

We need to change the job priority of the job.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.

760


what is the procedure and explain about real time scenario.

1484


do you use message subfiles? What are the necessary keywords required coding a message subfile?

694


which program rpg or cl is efficent to update a transaction onto a database file and why ?

749


what is data area and how it is used in rpg program ?

760






1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?

501


how do I declare a minor?

720


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

523


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1765


When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?

513


How to call one program from another program in RPG? please help me with the code

1265


what is the use of sflnxtchg?

807


is this a rpg channel?

684


what do you mean by an input subfile, what are the keywords required?

779


are there any useful c runtime apis that I can call from rpg iv?

705