how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.
Answer Posted / seduraman
m15 1:2:4 (7 parts)
cement 1/7 x 1.57 = 0.225
Sand 2/7 x 1.57 = 0.45
Jelly 4/7 x 1.57 = 0.90
Cement : 0.225 x1440 = 324kg
Total nos of bag of cement : 324/50 = 6.48 Bags of cement
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
what does the track parameter mean in staad.pro?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Explain the advantages and disadvantages of using plastic and timber fenders?
What is the compressive strength of fly ash bricks?
Wats the formula of eccentric footing and how was calculated from concrete qty
how to take concrete quantity for precast segment for viaduct project?
How many axes do cartesian coordinate system has?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
What is portland cement
Why are separation membranes used between concrete pavement slab and sub-base?
Formula for calculation volume of essentric footing
Define polar co ordinates.
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
How to estabilish reinforcement Steel rolling margin for a building projects ?