Cement required water for chemical action to achieve
strength. Minimum requirement of water is 30% by weight of
cement and workability for concrete also important so adding
more water which is not good for concrete and unavoidable.
Now a days Admixer is available and using for workability
for concrete for any cementenious works.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What black man invented the clothes dryer?
Doul Bar reinforcement and details of drawing.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how much of the strength comes from post-production curing
What is the difference between a wood shake and wood shingles?
How to calculate steel for beam slab and column
why does the most of civil engg is not intersted to going for teaching field?
How many % we consider for lap for reinforcement for estimates
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What is unit weight of normal concrete?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What is thumb rule in quantity and cost estimation of a residential building?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
What is meant by a context menu in a cad software?