Answer Posted / naresh lamba
the water is increase the workablity and easily avilable as
compare other source,,it also react with cement and produce
heat of hydration due to lime
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
what is cement wastage percentage in NHAI ROAD WORKS
3. What are the disadvantages of your present job, things you do not like about it?
What is braced excavation all about?
Explain the design for rcc multi-storied building?
what is BPM in concrete demolition hammers. what is better a higher value or lower
Aptitude, reasoning, quants, verbal and technical question
What is the diff between cad & cadd?
Explain soil analysis?
How to calculate material and labor required for 100 m2 plaster?
What is absolute pressure? How absolute pressure is calculated?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs