How to find quantity of cement mortar?
I want to know the req quantity of cement for plastering 300
sft in final coat with 12 mm. Any math involved? Plz help
Answer Posted / sachin
Assume proportion 1:5
total work = 300 sq.ft.
convert in m3 = 27.87 m3
thickness is 12 mm = 27.87 *.012
total volume = .33 m3
proportion is 1:5 = 1+5 = 6
so = .33 / 6
so = .055
cement per bag volume is 1440/50 = .034
so .55 /.034 = 16.17 bag
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
Did any of the egyptian pyramids ever fall down?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
What are the different types of civil engineering?
what is the difference b/w full length and cutting length?
What is difference between limit state and working stress method? How it is applies in building structure.
What is the difference between 53 grade and 43 grade cement
what are the Task work of different labour.?
what else we can add rather than admixture in concrete to reduce the cement quantity?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what is diversion?
types of laps in column
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?