Answer Posted / sahil salota
the water is increas the workebility and esily available as
compare other source, it also react with cement and produce
heat of hydration due to lime.
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
what are the duties of Site Engineer in work site?
1:4:8 pcc calculation 591 cu.ft
How to calculate the crank rod in slab
why are you joining in this (applied post) job and your aim for this job
Which tests are performed on soil to decide the type of foundation to be provided.
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Material calculation of cm 1:6 for 1sqm
Define What does civil status mean?
How does siphoning work?
What is difference between engineering stress and true stress?
five requirements of infill panels for walls?
What is chemical composion test
Volume of 25kg putty bag & 40 kg putty bag volume??
what is SDLC ?and write a 'c'program for to swapping the three numbers?