Plastering with cm 1:5 mix( one cement and five sand )
to 12 mm thick. How much Bag of Cement (50 Kg) and Sand (Cum)

Answer Posted / gyana prakash

taking 100 m2 wall plastering will be 2 cubic meter . hence
amount of sand = 2*5/6=1.67 m*3 and cement = 2/6=0.33 m*3 =9.5 bags

Is This Answer Correct ?    6 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to design and calculate materail quantity for concrete speedbreaker ?

5528


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1770


How to increase a bearing capacity of soil?

743


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1310


How to compute minimum number of columns required for a site from area of site?

1669






Questions related to civil.engg in company

1676


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

1770


types of laps in column

2016


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

1764


what is tension footing?

1627


i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11648


how to calculate spacing rod in column

1518


Explain what is the difference between built area and super built up area?

819


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

2462


how to control PQI (Project Quality Index)

10022