how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / karan bagga
lets the take size of brick is .230*.115*.075. now calculate
the quantity for 10 cum.
Area of one brick without mortar -0.00198375 Cum
No of brick in 10 cum= 10/0.00198375 (Area of bricks).
=5041 nos of bricks.
now calc. the bricks quantity in 10 cum with mortar.
lets take the mortar used 10mm in brickwork then
size of brick will be taken with mortar is =.240*.125*.085=
0.00255 (Area of one brick with mortar).
now in 10 cum brickwork no of bricks calculated with mortar
is=10/0.00255 =3922 nos
calculate the mortar in cum= bricks without mortar- bricks
with mortar= 5041-3922=1119 nos
Now area of brick without mortar is .230*.115*.075*1119=2.22cum
now 15% for frog filling and wastage taken in acc.
=2.22+2.22*15/100=2.55 cum
Dry volume is the 1/3rd of wet volume of mortar=
2.55+2.55/1/3=3.40 cum.
now the ratio is 1:6=7
3.40*14%=.486 cum cement
3.40*86%= 2.92 Cum Sand
=.486/.0347= 14.01 bags/10 Cum
= 14.01*6=84.06 Bags/10 Cum
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
rate analysis hiring of generator 62.5 KVA
Define What is a kip?
how to identify the failure of building by expansive soils
Why are separation membranes used between concrete pavement slab and sub-base?
what could be the production cost of 1 cum of concrete by CP30 plant
What do you mean by tolerance factor of concrete ?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
Which Types Of Bricks ?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
i need gate exam civil engineering question papers with answers
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
What is the Null Point of chimney in Power Plant
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used