In operation modes i have schedule some jobs in off peak
but the jobs are not completed with in time of off peak
what happen at this time whether they wait until jobs
complet or change to peak mode ?
off peak time interval is from 6.0 pm to 6.0 am and
peak time interval is from 6.0 am to 6.0 pm
Answer Posted / m k chaitanya
During operation mode switch the existing processes are continued to complete their jobs and after completion of their jobs they will switch.so here processes are wait until they completed their jobs later they will switch.
| Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
What will you do if u got Update failure?
Explain logon groups?
If a background job runs more than the time it should be completed normally then what actions will u take?
steps to congigure CMS in XI ?
Have you done any parameter changes using configtool and visual admin tool?
Myself Rahul am MBA(Mkt)having 1.5 years marketing experience.and in SAP-SD for 1 years experience.am looking for job.so pl anywher opening then pl let me revert.
What is transport layer and domain controller? In which system you have create domain control?
How should I set priority for Printing say like user, teamlead, project manager?
I want to let sap skip printing cover pages during printing for any kind of report. How can this be done?
How you can restrict multiple logins of user in sap? What are the thing you have to take care of while writing the id’s?
What is the difference between central instance & application server?
suppose in the landscape there is development, quality, pre-production and production system is there. what is the route(transport route) between pre-production to production? and why?
What is the purpose of table tadir?
What is an “ok” code is and what is the difference between “t-code” and “ok” code?
How can a user be able to access only for Customizing requests even if assigned se01 and se10?.