Suppose " You are given a build with 5 modules to test as
per the Customer request after finalization of SRS, But the
SRS contains only documentation about 4 modules. On what
basis you will continue the testing of 5th module." ?
Answer Posted / murthy
We need to clarify this with our client. If they asked us
to do testing for all 5 modules, then we need to get the
updated version of SRS. Once it get finalized we start
testing.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
why QA team is necessary for an organization?
I have interview on Guide wire testing. If you please share me.
What is pesticide paradox?
What is deferred status in defect life cycle?
how will you estimate of your website?
What is your Approach when you find 10 Sev-1 bugs in 50 test cases?
Explain the difference between alpha testing and beta testing.
what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?
What are the cases why parameterization is necessary when load testing the Web server and the database server?
what is diffrence between dynamic black box testing and dynamic white box testing
What is a code walk through?
Hi, this is murthysharma. I need very urgently about some terms which are used in use cases? Plz give reply to me, if any body know, It is really very very urgent. 1. what is the difference between basic flow,exception flow and alternative flow? 2.what are non-functional requirements in use cases? 3.what are exceptions, special requirements, business rules, assumptions, constraints. Kindly give me with the example. Bcoz, I am very new to this use cases. thanks in Advance. Regards, M.MurthySharma
how to test ecg machine?
What are the different available models of sdlc?
Can you explain exploratory testing?