Answer Posted / neelam saroj
Actually its Depands upaon the nature of structure.
Like Slab will have different then beam.
Eg Retaining wall, SLab, Beam, Column, Footing, Raft etc.
All will have different proportions.
| Is This Answer Correct ? | 7 Yes | 26 No |
Post New Answer View All Answers
Explain moment of inertia?
how many material required for brickbat water proofing of toilets.
how to remove the quantity of metal 1 and metal 2 in concrete
What is structural frames or systems?
please briefly explain calculating or estimating steel quantity for a RCC column?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
How much 1 cum of M15, M20 & M25 concrete weigh?
How many types of slabs are there & how to design it?
strength vs shape factor
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Explain what is progress payment?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How much time Required for PPR pipe network testing