how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / ajmal
2.83 CU.M = 1 UNIT
1 UNIT = 22 BAG CEMENT
1 UNIT = 70 FEET SAND
1 UNIT = 90 FEET METAL
1 UNIT = 200 KG STEEL(NET ONLY)
| Is This Answer Correct ? | 20 Yes | 7 No |
Post New Answer View All Answers
what is meant by shear center?????
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
What is Critical path in Ms-Project ?
What is specific gravity???
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
What are the different softwares used for cad?
What difference comes in constructing of house and a housing complex like society
How much cum. Brick work can do by 1 madon
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What is the ideal size of the living room ranges from small to large size?
What are the different approaches in designing the floors of the service reservoirs?
What is meant by autocad?