What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / surya kant upreti
given size of column 300X300 suppose ring bar is 10mm dia,
1st step
deduction for cover both side (40X2)=80mm
then ring size (300-80)=220mm
since column is square so its have 4 sides then
(220X4)=880mm
2nd step
for hook length take 10xdia of bar, then
(10dx2)=(10x10x2)=200
3rd step
deduction for bar devlopment in TMT at 90 degree bends:
5 bend, each bend devloped in lenght (2x dia of bar) then,
(5x2x10)=100mm
final calculation
step1+step2-step3=(880+200-100)=980mm
so length of bar for ring will 980 mm
| Is This Answer Correct ? | 42 Yes | 7 No |
Post New Answer View All Answers
What is the zero value in quantity surveying
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
what is the weight of 10mm,20mm,40mm aggregate
Explain the importance of moment of inertia?
what are the types of dimensioning?
The definition of national highway
what is the anchorage length of reinforcement.
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
1:4:8 pcc calculation 591 cu.ft
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
Define What is a kip?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
how many time use of plywood shuttering and IS code