how can we calculate cutting length of a column ring
(300 x 600)
Answer Posted / sagar tiwari
For column cover is 40 mm both sides
here
300-40-40=220
600-40-40=520
For hook (10 times the dia meter of the bar)
so for 8mm = (80mm)
For bending (minus) 5X2d=5x2x8=80mm
Now the cutting length of the bar will be =
520+520+220+220+80+80-80
= 1560mm
ring size =220x520mm
Is This Answer Correct ? | 313 Yes | 64 No |
Post New Answer View All Answers
I am called for interview from north east power plant .so, I need some interview question which may help me.
Who built the sears tower?
what mean By core Billing
Explain major differences between routing maintenance and major maintenance.
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
Process of pcc in wateredug
how i can tak Quantity of mortar in block work
What is the zero value in quantity surveying
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
How to find out kg per Sft ?
How much 1 cum of M15, M20 & M25 concrete weigh?