how can we calculate cutting length of a column ring
(300 x 600)
Answer Posted / sagar tiwari
For column cover is 40 mm both sides
here
300-40-40=220
600-40-40=520
For hook (10 times the dia meter of the bar)
so for 8mm = (80mm)
For bending (minus) 5X2d=5x2x8=80mm
Now the cutting length of the bar will be =
520+520+220+220+80+80-80
= 1560mm
ring size =220x520mm
| Is This Answer Correct ? | 313 Yes | 64 No |
Post New Answer View All Answers
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
a butt weld is specified by
how many litres of enamel paint required for 5000 sft of site??
important question on stones
can i get hindi version of is codes based on civil engineering?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What is the distance between railway tracks?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
How to calculate steel for beam slab and column
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
How to calculate 1 brss for RCC work
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
When column of building is abutting the boundary line,then suitable footing advised is