Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference b/w GSB and WMM?

Answer Posted / rahul

There is a difference
of size but the main
factor is of water
that we just
prepaired the bed
with best compected
NGL, cured with water
then we get down the
gsb on that bed, but
i think that we
easily make wmm with
out any water cured
but the NGL is in
better position.

Is This Answer Correct ?    4 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define What is an ice dam sock?

1281


How much quantity of rod binding work by a rod binder per day

1493


What is meant by solid geometry?

1064


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

2322


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1399


Tell me about triple point of water.

1111


who to find building iron rod strenth

2159


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

2362


1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

2696


what is differences between ferrock and concrete ?

2052


why we use 19x9x9and 20x10x10 but not other

2156


How to calculate quantity of plum masonry in 1:3:7

2969


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2085


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

2380


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2465