Answer Posted / rahul
There is a difference
of size but the main
factor is of water
that we just
prepaired the bed
with best compected
NGL, cured with water
then we get down the
gsb on that bed, but
i think that we
easily make wmm with
out any water cured
but the NGL is in
better position.
| Is This Answer Correct ? | 4 Yes | 11 No |
Post New Answer View All Answers
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
How many mortar required for Brickwork of 1 Cu.m works??
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
how to calculate testing date
Moisture content calculation for diff mix ratio's ??
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to find ssm in foundation?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
What are the responsibilities of a construction manager?