Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

primary of transformer connected to Dc supply in series with
switch, and secondary connected on ammeter, what happens
when swith On and OFF. (or) if continuously On and OFF

Answer Posted / jagadeesh

it works ausally when connected to primer y in series with
high resistance

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

whether fibre optic cable in high voltage earth conductor is used for protection circuits

1559


electrical ques

2081


What is the working principle of servo motor? And explain it.

1873


What is the Resposiblity of Electrical Utility Engineer

2870


Define thermal resistance in the context of power amplifier.

1072


why occ characteristics curve in not tracing back when we are bringing back the rhoestat?

1813


3ph motor running with unequal kw and different pf what are the reasons

1765


What are conduct on the testing in cf in ur site?

1604


WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.

2638


What are the types of feedback oscillators?

1223


What should be current in the Primary and secondary side of 1000KVA (11KV Supply)Transformer.?

1004


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1538


If not into production, how far did you follow the design and why did not you see it into production?

2113


What does Bode plot tell you?

1313


in india per day how much power is generated including all power station

1883