how to calculate the quantaty of steel in footing please show
me detail procedure with the help of drawing

Answer Posted / mohammed abdul moid

Take footing F= 4 No's size 1.2m*1.2m. and 6No. of
16mmbars
take bottom bar 1.2m and depth 0.5m
Total length L= 1.2+0.5= 1.7mt*1000= 1700

Formula =[3.14*0.00000785*16/2*16/2*1700]*6(No of
bars)
=[3.14*0.00000785*8*8*1700]*6
=[2.6818]*6 = 16.09
=[16.09]*2(Top n Bottom bars)=32.08
=[32.08]*4(No of footings in plan)
=[128.72kgs]

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is dead load impact load live load

1377


what is the types of surveying?which type of survey carrying for type of work?

1679


how gradation of aggregates effect on slump of fresh concrete?

1835


what is the type of earthing

1776


which type of instrument included in plumbing work?name of instrument?

1718






How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

1649


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1549


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2059


which red: used in roof teping, then use only cement

1567


what is the difference between tsp & tower

1715


The concrete slump recommended for beams and slabs; is?

768


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

1308


How will you Engage Labours on Site?

1416


what are the proper pipes for salt water line

1866


what is moment-curvature relationship in semi rigid connections??

1663