Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Capacitor bank require for 1000amp load

Answer Posted / wareagle

The need for capacitors is determined by load power factor
and utility billing rates. If you load has a PF of 1.0,
then no capacitors are needed. If the utility does not bill
for low PF, then you may not need capacitors.

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate total harmonic distortion level(THD) in VFD? and how can we reduce harmonics?

4044


why the check zone and main zone are used for Busbar Protn. scheem?

2169


what is droop control?

2167


What is ramp signal?

1096


Why slip ring ind. motor power consumption is low compare to induction motor .same 90 kw motor used same load output

1824


The moisture in air will condense at

1173


For a spring controlled governer the relation F = ar+b (F is the controlling force, r is the radius of rotation a and b are constants), indicates that the governer is

1215


State the methods of improving power factor?

1141


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1949


Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???

1947


what happens when dc generator coupled with cycle shaft.also explain what happens when its loaded

2123


why power not passes in plastic and rubber material

1963


What is resolver and glass scale in CNC how they work?

2272


What is the maximum operating temperature for a thermoplastic insulated cable?

1125


What are the Full Forms of TVM, MTL, CVT ?

1419