Answer Posted / k.l.b.srinivas
BEFORE STARTING PLASTERING WORK IF ANY CONCRETE ELEMENTS
LIKE COLUMNS,WALLS ETC. WE HAVE TO DO POINTING / HACKING.
ALL THE SURFACES WHERE PLASTERING IS TO BE DONE SHOULD BE
WET BY APPLYING WATER. AT THE JOINTS GROOVES SHOULD BE
MAINTAINED TO AVOID CRACKS. PROPORTION OF MIXING SHOULD BE
PROPER.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Explain moment of inertia?
Give me an example of a time when something you tried to accomplish and failed.
The foundations are placed below ground level, to increase?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
for pretensioning which will yield first and same for post tensioning?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
How do you compute the volume of airflow?
explain the rale of the government in the construction industry
how to design and calculate materail quantity for concrete speedbreaker ?
What is unit weight of normal concrete?
Forces in a Shear Wall are in plane or out of plane ?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
what discoveries did you have in relation to your course?