Answer Posted / k.l.b.srinivas
BEFORE STARTING PLASTERING WORK IF ANY CONCRETE ELEMENTS
LIKE COLUMNS,WALLS ETC. WE HAVE TO DO POINTING / HACKING.
ALL THE SURFACES WHERE PLASTERING IS TO BE DONE SHOULD BE
WET BY APPLYING WATER. AT THE JOINTS GROOVES SHOULD BE
MAINTAINED TO AVOID CRACKS. PROPORTION OF MIXING SHOULD BE
PROPER.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what isload waring calculation
What are the responsibilities of a construction manager?
How can i display 5 asterisk and another 5 asterisk )?
What is modular elasticity?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how many material required for brickbat water proofing of toilets.
why does the most of civil engg is not intersted to going for teaching field?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
Define current ucs?
why we are using stub column..? is it possible to construct steel stub column..?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What are the advantages and disadvantages of using plastic and timber fenders?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What is the Unit weight of coarse sand (F.M- 2.20) ?????
Civil engineering material testing Standard results