Answer Posted / k pradeep kumar
Civil Engineering is a branch which help the nation to
develope and stand in the world with proud. I want to
do something for the development of nation. So i choose be
an Civil Engineer. But today i am very unhappy for taking this engineering as my career because so many unemployment people getting the jobs by putting the fake certificates also some of companies encouraging the field supervisers and giving the equal salaries and equal importance to those untrained and un certificated fellows for their selfish purpose. I am very unhappy about this. I am graduate civil engineer and i love civil engineers but not this engineering.
| Is This Answer Correct ? | 37 Yes | 16 No |
Post New Answer View All Answers
what is flexible and rigid footing?
What is dead load impact load live load
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
Does VDF add strength to the flooring apart from preventing water ingress?
how u design STAGING for Superstructure in BRIDGE construction?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
what is m30 in concrete tiles
all technical question
What are the problems one might face while having a Cantilever balcony?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is the calculation of raw material for 0.35cum of m-15
Can we use concrete of slump cone in cube casting in which we have already measured slump?