Can we operate a DG Set in paralell with Transformer ?

Answer Posted / meka sekhar

theoretically DG can be operated parallelly with
transformer as long as voltage, frequqncy, phase angle are
within limits. However, in industrial practice, only
momentarily paralleling will be done between DG &
transformer. Sometimes if they want to check loading of DG,
it can be paralled with transformer so that it will not
affect loads which are connected to bus.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which power will flow first if we switch on a motor Active or Reactive? How?

4393


In constant power region of 3-phase IM torque-speed characteristics, if frequency increases flux A does not alter B decreases C increases D none of above

1758


use of PIR in ehv breaker

1717


Capacitor is load free component but why ampere meter shows current when capacitor bank breaker close?

692


what is the relationship between current&voltage in practical purpose ?

4286






What is signal flow graph?

661


WITCH CARDS IN USE IN FIRE CONTROL PANEL.

1466


What is limitedly stable system?

667


from which formula we select a capacitor rating?

1631


According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

1522


iam preparing for rrb section engineer post in electrical branch.suggest the right textbook for my reference.fromwhere i will get the previous q.papers?

1736


what type of questions are asked and howmwny questions belong this catagory?

1720


two way ckt diagram can be drawn by how many ways? give diagram

1349


if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.

1148


how can i use REF and diffrencial relay both in 1 CT core for transformer protection?

1378