Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40

Answer Posted / ujjawal u. d.

the penetration caused by standard Condition i.e.
Standard Weight= 100 gm
Standard temp. = 25 Degree C.
Standard penetration time = 5 Seconds
Unis = 10th of mm to show the results and avoiding Errors
e.g. if the value is 30/40, the 30/40 is the bitumen
penetration value (tested in standard condition) lies
between 3 to 4 mm.

Is This Answer Correct ?    109 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6115


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

2272


What is the best type of wood glue?

1203


what are the duties of Site Engineer in work site?

1679


what is the difference between prime coat and tack coat in road construction

5100


What applicable rate of wct in bihar

1886


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

2123


When was the first motorway built in england?

1119


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1883


Which percentage of carpet area use in plot area of office building.

2053


How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?

11218


Why we provide hair pin for shed

2424


What is the difference between Hinged and pinned in Column ends

5330


What is a kip?

1260


What is made from large rocks, which protects the base of cliffs?

1371