Answer Posted / shenbagaraj.t
all vertical surfaces is shuttering and all horizontal
surfaces is centering.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Define What is the distance between railway tracks?
What are the benefits of rcc pipes over steel designed pipes?
Explain the different types of building contracts?
For what purpose bedding is used under storm water drains, explain?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
i need gate exam civil engineering question papers with answers
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Why steel rods are produced only in even dimensions?
What will you do if a portion of load bearing wall collapses under your supervision?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
How is make concrete cube?
In a concrete grade C35A, C & A stands for what and equalent cube strength?