How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper
Answer Posted / m subbramanian
Along with above calculation, the distance travelled by the machine should also been taken into account.
| Is This Answer Correct ? | 44 Yes | 6 No |
Post New Answer View All Answers
What is the difference between engineering stress and true stress?
how to find hardness of water?why it should be determined?
what is stressing
What is the meaning of soil reinforcement?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
How to take labor charges for construction of 1cum of concrete?
"Gates of the dams are generally designed of curved shape". Why?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
In block work seawalls what is the purpose of slip joints?
how can i calculate cement in brickwork
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
significance of specific surface area of particles?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11