Answer Posted / rajesh.m.kon
ESD- Emergency shutdown... it is for shutdown the total plant
during or in-case of any emergency like,high pressure accured
in process , instrument air failure, or any utility failure.
PLC- programmable logic controller.. by implementing logic or
program's , we can achieve the ESD by using PLC
so ESD is a kind of logic, PLC is a hardware.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
hi friends,im an instrumentation and contol engg student,can u hlp me of suggsting barc written question paper,my id is roysuvaranjan@gmail.com, cel no.9563591747
What is the right procedure for adjusting the gap voltage of bently nevada vibration sensor?
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
What is zone,loop/fire alarm system?
WHAT IS THE DIFF. BETWEEN SKIN TEMPERATURE AND PASSES TEMPERATURE..?
i need some objective type questions in instrumentation
Question on maha cement
What is the differerence between hysterisis and linearity.
need to calculate flow rate with the help of dp range and orifice bore dia and size. range is 0 to 400 inwc and orifice size is 12 inch 150 # rf and bore dia is 7.180 inch. need to calculation for flow rate
Area classification, Equipments, Gas groups, temperature classification, Ingress protection, Fire Extinguishers.
Pressure tx shows 1 mbar but we need 1000 mbar at this process condition .. how can we sort it out .
What are different types of orifice plates? State their uses.
Why we are using DPT(Differential Pressure Transmitter) in separator instead of level trasmitter?
what are the values of fuel flow rate in various places in boiler.
Which types of quections asked in interview for FORMULATION PLANT (PHARMA)