Answer Posted / sjtbehera
yes it is correct. it is a thumb rule for site execution.
but it vary on grade of concrete and steel. say in m20 grade
normally 41d for lap length
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is BPM in concrete demolition hammers. what is better a higher value or lower
what is the weight of 10mm,20mm,40mm aggregate
What is Curtailing of R/F
Time required for curing of wall tiles before fixing
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
what is that one cub metre plaster in cemant and fine sand
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
How much is the cover for slab?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What are the composition of a landfill?
What are the basic use of runners and standards of pipelines?
What do you mean by honeycomb in concrete?
What is Heavy Concrete & Normal Concrete
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)