HOW we can calculate the quantity of sand and cement for 1:4
plastering with a thickness of 12 mm..total area need to be
plaster is 985 sqm
Answer Posted / karthikeyan
1" = 25.4mm so,
12mm = 0.5"
total area = 985 sqm
1 sqm = 10.76 sqft
985 sqm = 10598.6 sqm
10598.6*0.5 = 5299.3 cuft(149.97 cum)
for 1 cum (1:4)1/5*1440 = 288 kg so
149.97*288 = 43191.36 kg
50 kg = 1 bag, so
863 bag cement is required
1 m^3 cement = 1 m^3 sand s0 863kg sand is
required
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
How cracks in concrete can be avoided?
Why was the empire state building made of steel?
pls give me some basic informations in construction of a structure?
How to determine spacing of bars in slabs or beams
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
What do you understand by “preset” during the installation process of bridge bearings?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is the use of offset command?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
How to calculate unit weight of concrete for m40 grade.
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what is pqc
What is the material consumption- cement,sand,tiles etc for Toilet dado?