Answer Posted / faizan ahmad
when one of the force is zero in all three principal stress acting on any element is called bi axial.where as if two forces is equal to zero in three principal stress is called uniaxial
| Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is the force exerted by the tacoma narrows bridge?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
In Rcc ratio calculation I wanted to know quantity of Steel also.
how to identify np3 pipe and np4 pipe
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is bylayer?
How many square meter can a worker/labor demolish a structure per day?
calculate the quantity of water for 1:6 cement mortar
Any strength is a stress but any stress is not strength
Slump Values for works?