For 25mm thick plastering how much sand and cement is used for 1 sft
Answer Posted / karthik rajendren
For 10 Sqm = 10*.025=.25M3
Assume 25% Dry Mortor =0.25*1.25=0.3125
30% Wastages =0.3125*1.3=0.40625/10
For 1 Sqm =0.040625 M3
For CM 1:4,Cement
= 0.040625/5*28.8
=0.234Bags/m2
=0.234/10.764
=0.0217Bags/Sft
Sand=0.0217*0.035*4
=0.0031M3/Sft
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Why you are leaving present job?
115mm thickness brick work how to required mortar
Describe Briefly The Various Methods Of Concrete Curing?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
How is improve my knowledge in construction industries....
Volume of 25kg putty bag & 40 kg putty bag volume??
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
what are the five benefits of using standard terminology in the measurement process?
How and where are aqueducts built?
how i get all type of short type question answer about civil engg
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?