how many 1st class bricks in 1cu feet?
Answer Posted / waseem ahmed
in Pakistan
13.5 bricks are considered in one cubic feet as standard, because of uneven brick size, normally if the standard size is taken (9"X4.5"X3") it becomes 121.5 cubic feet and if you convert 1 cubic feet it will be 1728" (12"X12"X12"), on dividing 1728/121.5= 14.2 bricks in one cubic feet, and if you exclude 25% mortar from cubic inches(1728) it will be 1296, now if you divide cubic inches with standard brick volume 121.5 you will get 10.6 bricks in a cubic feet, but due to uneven and improper shaping which varies from city to city and more breakage during logistic a 27% wastage is calculated on the number of bricks which is almost 13.54, there fore it is considered in Pakistan 13.5 bricks in a cubic feet.
| Is This Answer Correct ? | 55 Yes | 8 No |
Post New Answer View All Answers
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
How to make a c++ program that converts any base to base 10?
What is zoning permit?
how much cement sand n bricks required in im3?and how much in plaster?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
How can i display 5 asterisk and another 5 asterisk )?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is the criteria for the finalisation of pavement thickness in road project?
how many time use of plywood shuttering and IS code
What materials were used to build the golden gate bridge?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Describe the various methods of concrete curing?
What are the common ways of demolition?
what is column foundation