how to calculate rate analysis for column shuttering
Answer Posted / rustam jamal
Assume Column Size- 1.200x0.300 and Height = 3.000
than Qty for Conc. = =1.2x0.30x3.0= 1.080Cum
Shuttering Area = 2x1.2x3.0=7.20
= 2x0.30x3.0=1.8
Total =9.0Sqm
In 9.0sqm Shutterin 1.08 Cum Conc. req.
so For 1 Cum Shuttering Qty = 8.333
In case of Columns we required 8.33 sqm of shuttering area
in 1 Cum of Concrete
Is This Answer Correct ? | 88 Yes | 31 No |
Post New Answer View All Answers
What is the strongest bridge for a school contest?
How to cal. The weight of hollow pipe?
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
what do you understand by M25 concrete
Which architectural movement is also known as jazz moderna?
Why are steel plates inserted inside bearings in elastomeric bearings?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
what's the formula for calculate pcc for matt(45mm aggregate)?
Define Workability ?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
Please let me know what is the simplest way of Calculating Mix Designs