what means if slump is less than 25mm and greater than 80mm?
Answer Posted / utsav patel
slump test represent the consistency and uniformity in concrete.if slump is more than 80mm workability of concrete is very high and uniformity is very less.while slump 25mm workability is very less so more cmpaction is require.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
what is the method used for marking of cantilevers in hirise buildings by using theodolite
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
how to calculate steel for slab or footings?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
residential buildings,mixing of concrete,structural,construction material,site handling.
What is the difference between EPC,DBOOT and BOOT.
how to calculate quantity of bricks in circular manhole with examples.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
in design case of structural member best suitrable percentage of steel limit is what
how is the reinforcement is distributed in triangular slab