Three phase alternators are connected in star connection
why?
Answer Posted / muhammed konikkal
out put is required in AC form with neutral.Neutral can be taken only from Star connection. We can take out put single phase or three phase depending our load.
Is This Answer Correct ? | 8 Yes | 7 No |
Post New Answer View All Answers
i am electrical and elctronics engg passed out in 2009 want to attend for reliance placements.plz send me apttitude ,technical and hr question answers to my mail plz. my mail id-kat.bindas@gmail.com
WHAT IS DOL STARTER? HOW IT WORK? GIVE ITS CONTROL AND POWER DIAGRAM .
in general it is observed in power stations, the tertiary winding is used in higher rating Y-Y auto transformer but not in Y-Y power transformer. is the tertiary winding is compulsory then why it is not using in power transformerÂ
why can the rotor of 3 phase slip ring induction motor not be a 2 phase rotor?
H.t motor 6600 volt to same motor lt supply 440volt supply applyed to h.t motor to effect....
what are the steps involved in generator load test?
ratings of lightning arrester
how can get electrical c licence.now i am working in spining mill , transformer capacity 2750KVA. SANCTION DEMAND 2250KVA. PLEASE ADVISE ME . MY CONTACT NO 09944226823
How to assume answer to electrical questions
what do u understand from filter factor of reactor?
what is distribution board?
Please brief what is sinewave
define as synchronous generator
what is The difference between national electrical code and I.S.Code (electrical) and what is the value of NEC in electrical engineering field
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?