please explain clearly in PID controller if We increase P
only what will be action of the contrlere.
Answer Posted / carl_ellis
Any given amount of error will produce less output change
than before the proportional band was increased.
Increasing the proportional band will make the controller
less sensitive to the deviation of the process variable
(PV) from the setpoint (SP).
Tell 'em Carl sent you.
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
What is stripper & spilitter ? Diffrence in this.?
What is instrumentation instrumentation engineering?
any questions on motor and energy conversions machines?
what is wave length were using ?
Boolean algebra
KAlman filter code for two dimension?
I faced several time siemens ps2 positioner automatically getting Chang in it's set point direction after auto calibration So is there any causes biside this or any permissives ?
What happen if I install my pressure transmitter below the elevation of pipe in natural gas service?
Introduce yourself which is not present in your biodata?
Why plc require in analog input 4-20amp & 0-10 volt?
Isometric drawings are generated during _________________ phase of a project
How to Calibrate Vortex Flow transmitter in field
how will you segregate the alarm levels in alarm management system during factory Acceptance Test
Difference between dcs and plc including date processing and architecture.
what is instrument philosophy