How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / baldeo m. sarwe
Yes this formula is near abovet is correct
| Is This Answer Correct ? | 27 Yes | 10 No |
Post New Answer View All Answers
How much quantity of cement,sand,stone used to build 1 cum of cc road??
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
what is difference between fluidity and workability also how palsticizer works
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is the meaning of degreasing of the euipment or line.
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What are the different types of foundation?
What is the compressive strength of fly ash bricks?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Explain the advantages and disadvantages of using plastic and timber fenders?
Will water damage concrete?
What is the Roll of Water Bonding under VDF road?
what is the use of beam end forces while using a staad ? wha they are show
how to control PQI (Project Quality Index)
Water filter calculation formula