How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / baldeo m. sarwe
Yes this formula is near abovet is correct
Is This Answer Correct ? | 27 Yes | 10 No |
Post New Answer View All Answers
What is the largest concrete dam in the world?
How to take labor charges for construction of 1cum of concrete?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is the tallest man made structure in the world?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
How do you measure water flowing through 300mm diameter pipes?
What are the problems one might face while having a Cantilever balcony?
What are the alternate material for steel, Sand and aggregate
Where is the worlds longest elevator and how long is it?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
what is SDLC ?and write a 'c'program for to swapping the three numbers?
how much cement and sand required for 100sqm of wall plastering in different proportions
What is chemical composion test
what is the water-cement ratio of mix design while 30mpa in 7 days?