how to calculate rate analysis of M25 grade concrete

Answer Posted / karthik rajendren

Cement - 7.2 Bags*280 = 2016
Sand - 0.6 Cum*400 = 240
Aggregate 20mm - 0.9Cum*890=801
Plasticizer - 2.1 Kgs*50=105
P+M - 450/Cum
Total = 3612

Note
*The rates may vary depends on location
*The cement bags 7.2 is as per design mix,it may vary if we
choose hand mix

Is This Answer Correct ?    5 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is proportion of PCC Grade G?

1765


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1622


can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??

1979


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

2052


What does civil status mean?

894






define the strength

1900


How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?

1748


I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?

2301


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

1868


why are you joining in this (applied post) job and your aim for this job

2309


why do we not deduct volume of steel to find actual volume of concrete in practical???

1552


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1225


What is the diameter of the 3"inch nails?

1732


What is a projection line?

894


a butt weld is specified by

2766