200sq.ft of slab and thickness is 6" in that how much cement
are required(bags), sand & aggregates are in cu.m, choose
grade of concrete is m20.
Answer Posted / guest
Cement bag is 20 Nos
Sand 50 cft
Aggregates 100 cft
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to determine H- zone in a column? where it will occur?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
What is difference between limit state and working stress method? How it is applies in building structure.
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
what is the price of a cubic meter of concrete on international market?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
how much need sand and cement for 1 cft roof construction?
What is the minimum size of the particles of silt soil?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What is bmc stands for in bmc software?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
what is SDLC ?and write a 'c'program for to swapping the three numbers?
five requirements of infill panels for walls?
Permissible wastage of cement as per IS code ? In which IS code I get it?