200sq.ft of slab and thickness is 6" in that how much cement
are required(bags), sand & aggregates are in cu.m, choose
grade of concrete is m20.
Answer Posted / single ravi
200*.5=100cft/35.32=2.83cum
2.83*6.5=18.39bags
18.35*50=919.75kg of cement required for the given problem
Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
how to stop beam concrete between column
why we can use dust in concrete insted of fly ash
Advantage of Aluminum form work in terms of activities can be skip and cost too
how much one carpenter can doing shuttering of slab in one day
specifications of fe500 steel
Explain what are the skills required to become an architect?
what is castigliano theaorem
What are the applications of modulus of elasticity?
What should be the standard roof height like to be?
What are the techniques to measure road difference?
Trapezoidal section footing calculation of Volume & its Area
what is the water cement ratio for plastering
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
Why are the bolts that hold steel rails together in oval holes?