ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars.....
IS THIS CORRECT ????
Answer Posted / vicky4all
Wrong
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Spider cracks occur in beam bottom due to––
In reclamation works what are the importance of geotextiles and sand?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Civil engineering related
Permissible wastage of cement as per IS code ? In which IS code I get it?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
What are the uses of alloys in daily life and how are alloys made?
Calculation of curtain wall of box culvert
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
How much 1 cum of M15, M20 & M25 concrete weigh?
What is different between DI Pipe and CI pipe?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What is the use of array command?